Skip to content
Green Hardwood

How it works

How long does hardwood installation take?

An 800–1,200 sq ft GTA install is typically 4–8 days plus acclimation before and cure after if site-finished. Stairs add 3–6 days. Condos and custom patterns add time we put in the proposal.

Read the full detail — that page covers method, materials, price band, and warranty rather than the short version.

Related service

Hardwood Floor Installation

Precision solid and engineered hardwood installation for new builds, gut renovations, and room-by-room upgrades. Subfloor, moisture, and acclimation come first — the finish is the last 10%.

From $11–$22 / sq ft installed · Typical 800 sq ft home: 4–8 days

Installation in the GTA

How we actually do it

People also ask

Want this answered for your house?

A range is a range until someone reads the moisture in your subfloor and measures the flight. Site visits are free across the GTA.