Skip to content
Green Hardwood

Glossary

Every word on a hardwood quote, in plain English.

If a contractor uses a term you have not met before and does not explain it, that is a choice. Here is the whole vocabulary — twenty-two terms, no jargon defended with more jargon.

Installation

How the floor meets the building.

Nail-down#

Hidden-fastened solid hardwood into a wood subfloor.

The classic house assembly: solid boards blind-nailed or stapled to a wood subfloor. Correct on dry joists. Wrong on concrete.

See also: Glue-down, Acclimation

Glue-down#

Hardwood set in adhesive over a slab or substrate.

Engineered — and sometimes solid — boards trowelled into a mill-listed adhesive. The default on condo slabs and radiant floors.

See also: Nail-down, Engineered hardwood

Floating floor#

A click system that rides on underlayment.

Boards lock to each other, not to the subfloor. Allowed when the mill requires it. Not a disguise for an unflat floor.

See also: Glue-down, Engineered hardwood

Engineered hardwood#

Real wood wear layer over a plywood or HDF core.

A hardwood floor with a sliced or sawn wear layer laminated to a stable core. Specify wear-layer thickness if you want a future sand.

See also: Solid hardwood, Wear layer

Solid hardwood#

A board milled from a single piece of timber.

Typically 3/4-inch oak, maple, or walnut. Maximum refinishing life. Moves with Ontario humidity. Belongs on a dry wood subfloor.

See also: Engineered hardwood, Acclimation

Wear layer#

The real-wood thickness you can sand.

On engineered boards, the top wood layer. Under about 3 mm, a future full sand is a maybe. Photographic films are not wear layers.

See also: Engineered hardwood

Acclimation#

Letting boards reach the room's moisture content.

Material staged in the finished HVAC condition until wood moisture and room moisture agree. Closed cartons in a garage do not count.

See also: Nail-down

Moisture survey#

Metered readings of slab or wood before install.

A grid of moisture readings that decides whether we install, wait, change the spec, or walk. One number in the middle of the room is not a survey.

See also: Acclimation, Glue-down

Janka hardness#

A laboratory dent-resistance number.

Useful for comparing species. Not a substitute for the right finish in a house with dogs and winter grit.

See also: Solid hardwood

Expansion gap#

The space left at walls so the floor can move.

Covered by baseboard. Omitted by rushed installs. Ontario seasonal humidity makes this non-optional.

See also: Acclimation, Solid hardwood

Stairs

The parts of a flight, and what they are called on a drawing.

Tread#

The horizontal board you step on.

On a hardwood stair, a solid or thick-capped board. Leftover 3/4-inch flooring glued to a thin plywood tread is not a tread.

See also: Riser, Nosing, Retread

Riser#

The vertical board between treads.

Closed-riser stairs hide the structure. Open-riser stairs omit it and must still meet opening-size rules in Ontario.

See also: Tread, Open riser

Stringer#

The sawn or housed carriage that carries the treads.

If the stringer flexes, a retread is the wrong job. Sistering or a rebuild comes first.

See also: Retread, Tread

Nosing#

The projecting edge of a tread or landing.

Code limits projection and requires uniformity. A floor thickness that does not match the tread becomes a trip at the landing.

See also: Tread, Rise and run

Retread#

Capping an existing stair with new solid treads.

The standard carpet-to-oak conversion when stringers are sound. Not the same as a rebuild.

See also: Tread, Stringer

Open riser#

A stair with no riser board.

Legal in Ontario only when openings and guards pass. Many feature stairs drawn from social media do not.

See also: Riser, Rise and run

Newel#

The post a handrail lands on.

Must be fastened to structure. A hollow box trimmed onto drywall will fail in use even if it photographs well on handover day.

See also: Graspable handrail

Returned tread#

A tread with a finished end on the open side.

Required on open-side stairs if you do not want to see raw end grain and a gap at the drywall. A plank stuck to the wall is not this.

See also: Tread, Retread

Finish

What goes on top, and how long it lasts.

Site-finished#

Sand and finish after the floor or stair is installed.

Allows one stain formula across floor, treads, and rail. Needs dust containment and a cure window.

See also: Screen and recoat

Screen and recoat#

Abrading the existing finish and adding a new coat.

The high-ROI maintenance job when wear layer remains. Not a full sand. Not a colour change.

See also: Site-finished, Wear layer

Code & measurement

The words an inspector uses.

Rise and run#

The height and depth of each step.

Must be uniform on a flight. Ontario Part 9 sets limits. Squeezing an extra step to make a stair 'float' is how inspections fail.

See also: Nosing, Open riser

Graspable handrail#

A rail profile you can actually close a hand around.

Required. A wide decorative cap is a guard detail, not a handrail. Green Hardwood mills profiles that pass and still match the stair.

See also: Newel

These words in context: methods shows the assemblies, the stair studio runs the Ontario code checks, and answers covers the questions that usually come next.